Well Cost Estimation AFE Preparation

Projected Drilling Time, Time Categories, Time Consideration, Cost Categories, Tangible and Intangible Costs, Location Preparation, Drilling Rig and Tools, Drilling Fluids, Rental Equipment, Cementing, Support Services, Transportation. Supervision and Administration. Tubulars, Wellhead Equipment, Completion Equipment

APPENDICES 774

A—Case study (homework problem) 774

B—Brine fluid tables 782

C—AFE work sheets 800

D—Drilling equations 821

E—Drillpipe tables 828

F—Casing and tubing tables 847

+1 0

Average user rating: 5 stars out of 1 votes

Post a comment

  • Receive news updates via email from this site